Ningde, Fujian Steel Fish Farm Project
Through on-site imagery of the Ningde project, review the module combination, hot-dip galvanizing anti-corrosion treatment and walkway installation details of the steel fish raft.

Use site detail to understand delivery.
Project imagery shows regularly arranged fish raft modules, walkways and on-water operating passages. Structural and detail photos reveal how modules and processing treatment come together.
Structure, walkways and connections together form the operating interface.
The following are project photos and implementation details already disclosed in the brochure.

Module Combination
Regular modules forming the surface aquaculture and operating space.
Hot-Dip Galvanizing
Anti-corrosion treatment applied to the steel structure.
Walkways & Details
Unified walkway color scheme showing installation and component finishing details.
See the on-site presentation through processing detail.
Site photos are used to show the disclosed project; capacity, efficiency or lifespan are not extrapolated.

Component Fabrication
Inspect the steel components and their surface condition.
Anti-Corrosion Treatment
Compare components before and after hot-dip galvanizing.
On-Site Assembly
Review modules and passage layout through overall photos.
Understand the project conditions, and discuss the right configuration for you.
The following information helps confirm applicable scope and the proposed configuration.
Discuss a similar project based on your site.
Share your stock, site conditions and configuration needs, so we can clarify the scope and implementation approach together.
Request a Similar Project